FIRB — approval-to-settlement validity window

Last verified · in effect from

This doc owns the approval-validity window: once a foreign-investment approval issues, how long it stays good to settle under. It grounds the settlement_prep component (9) and the firb_workflow compliance gate's settle-by check. It is the second of the two FIRB clocks: FIRB approval — standard decision timeline owns time to get the answer (~30 days from full fee); this doc owns time the answer stays valid (~12 months). The plan reads both; neither restates the other.

The validity window

A no objection notification (the specific-property approval) is valid for 12 months from the date of approval, unless the Treasurer approves a longer period. The foreign buyer must complete the acquisition (settle) within that window. If the purchase is not completed in time, the approval lapses and a fresh application — and a fresh fee — is generally required before settling.

The same 12-month window applies to exemption certificates (New/Near-New Dwelling and the streamlined variants): a certificate is generally valid for 12 months from the date of approval (FIRB — developer new-dwelling exemption certificate).

Why the window is a planning input, not a footnote

For most established-timeline purchases the 12-month window is comfortable. The window becomes load-bearing in one situation the plan must flag:

Sources